Mobile
Log In Sign Up
Home > english-chinese > "plan layout" in Chinese

Chinese translation for "plan layout"

平面布置

Related Translations:
mine layout:  矿山布置
dial layout:  表盘配置
layout position:  直体姿势
layout automation:  布图自动化
layout man:  划线工
layout location:  定线
tooth layout:  轮齿剖面图
tape layout:  磁带格式设计带面格式设计带设计
layout plans:  平面布局规划平面图,布局平面
traverse layout:  导线布设
Example Sentences:
1.Study on initial path planning layout model for uav
无人机初始路径规划空间建模方法研究
2.Preparing detailed planning layouts and engineering designs
制订详细的规划图则及工程设计方案;
3.Town planning layout
城市规划详细蓝图
4.Part v at last the paper take the example of changsha new - high technology industrial development zone , and analyze its overall plan layout
5 、最后以长沙高新技术产业开发区为例,对其总平面布置进行分析。
5.Exchanges of land may be entered into by government for various reasons ranging from the rectification of lot boundaries to the implementation of a town planning layout
由于修正地界,以至执行城市规划蓝图计划等各种原因,政府也会与土地拥有人进行换地。
6.Step 3 : complete the bury of all anchors and connection of construction equipment & slings according to figure 3 : plan layout for lifting and figure 4 : elevation layout for lifting
第三步:依据图三:吊装平面布置图、图四:吊装立面布置图,完成所有锚点的埋设和施工机索具的连接。
7.An engineering and planning review study commenced in may 1998 to review the planning layout for the area and to define the scope and programme of each reclamation staging
工程及规划检讨研究已在一九九八年五月展开,以检讨该区的规划设计及界定每一阶段填海工程的范围及施工计划。
8.Part iii , this part aims at the production and development character of the the new - high technology industrial development zone , analyze and discuss the overall plan layout , pipe integration layout
3 、针对高新技术工业的生产和发展特点,对高新技术工业区的总平面布置、管线综合布置进行分析、探讨。
9.In consideration of hydrological , geological and other natural conditions , this paper describes the design characteristics of aoshan no . 5 berth in wharf plan layout , structural type selection and pile foundation design
摘要结合水文、地质等自然条件,介绍岙山5 (上标# )泊位码头平面布置、结构选型和桩基设计的特点。
10.The overall planning layout was gazetted in april 2002 and detailed design works started in june . this phase , together with the other phases of the central and wan chai reclamation , will accommodate strategic road and rail links along the north shore of hong kong island between central and the island s eastern part
这期工程连同中环及湾仔填海计划其他各期工程,将会提供所需的土地,以便沿港岛北岸兴建连接中环与港岛东部的重要连接路和铁路。
Similar Words:
"plan furnace" Chinese translation, "plan generator" Chinese translation, "plan grande" Chinese translation, "plan guanajuato" Chinese translation, "plan in hand" Chinese translation, "plan library" Chinese translation, "plan model" Chinese translation, "plan my future career" Chinese translation, "plan of a lecture" Chinese translation, "plan of a novel" Chinese translation